Stake offsets This command will stake out up to two user-defined horizontal offsets to a centerline at any station, as well as an unlimited number of offsets per station, if you are using a predefined Cutsheet Station and Offset List (loaded using the Settings button). Inspecting the EDM of the total station 23 Instrument errors in the total station 24 Simple surveying tasks 26 Aligning from the mid-point 26 Measuring slopes 27 Measuring right-angles 28 Applications programs 29 Calculating areas 29 Staking out 30 Remote heights 31 Tie distances 32 Free-station surveys 33 The applications programs available 34 This study aims to: (1) develop the concept of instructional media based on total station animation video which is used to measure building stake out; (2) developing interactive media designs; (3 . Figure 15-2B Hand Written Generated Slope Stake Notes There are various ways to slope stake a project, depending on which method you choose. total station and its applications in surveying by: md nizamuddin 1 fintroduction a total station is an electronic/optical instrument used in modern surveying the instrument can be used to measure horizontal and vertical angles as well as sloping distance of object to the instrument. However, by 2012, the Toronto Transit Commission stated that a relief line will be required by the 2030s, given the overcrowding and high demand along the Yonge corridor. Introduction This Total Station Training Manual is intended to help you understand and get the most out of the Sokkia Total Station that you have chosen. Ensure that the ground is flat and the tripod stand is firmly established on the ground. In December 2021, Metrolinx made a $49.5million agreement with the Islamic Society of Toronto to move to a larger facility at 20 Overlea Boulevard. 32. 1. Metrolinx kept the project a secret until the government chose to announce it on April 10. Left, bottom: According Connor Smith, setting up a total station and running checks on the jobsite takes almost as long as laying out the pointsabout 30 minutes for setup and layout work on the average project. Method B: Using a Level or Total Station When? SURVEYING INSTRUMENTS Series30R SET230R/R3 SET330R/R3 SET530R/R3 SET630R Reflectorless Total Station OPERATORS MANUAL SET230R3/330R3/530R3: Class 3R Laser Product Steph, Ben, and the team worked hard and were there for us every step of the way; whether it be diagnosing problems in the office, waiting on hold with tech support, emails, calls, etc. Angle Distance Stakeout Use known angle and distance to do angle distance stakeout Coordinate Measurement This program can record the detail information of angle . It combines the functions of a theodolite with that of a transit level and electronic distance meter (EDM).. ATheodolite is a instrument for measuring both horizontal and vertical angles, as used in triangulation networks. We conduct Workshops, Seminars, Summer Training and Internship Programs & Winter Training and Internship Programs all over India including Agra, Ahmedabad, Amritsar, Bangalore, Bhopal, Bhubaneswar, Chandigarh, Chennai, Coimbatore, Dehradun, Delhi, Delhi - Noida, Dibrugarh, Gandhinagar, Gangtok, Goa, Guwahati, Gwalior, Hubli, Hyderabad, Imphal, Indore, Jaipur, Kanpur, Kharagpur, Kochi, Kolkata, Kollam, Lucknow, Madurai, Mangalore, Mumbai, Mysore, Nagpur, Patna, Pondicherry, Pune, Roorkee, Trichy, Trivandrum, Varanasi, Vijayawada, Visakhapatnam, etc. Ranges of reflectorless total stations are given relative to 90% and 18% Kodak grey cards and may vary from 300 feet to over 3000 feet. Select . A retail strip mall with a No Frills supermarket will be demolished to make way for the station structure. 4Site Office allows downloading, formatting and processing of survey data, whilst 4Site Survey links directly to your instrument for infield recording of data. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. SITENG - Setting Out #7 "Stakeout" In today's video I am showing how to use the Stakeout program using a Total Station. The diversions would use what would normally be non-revenue streetcar tracks. Selection of a particular model, together with the associated data collector and. Mapping and stake out. Revision After a draft of the Ontario Line's business case was disclosed in July 2019, a number of concerns were raised by transit experts: The following route description is based on a revised plan issued by Metrolinx in September and October 2020, plus a revision published in April 2021. Angle-distance method to stake out the horizontal alignment by total station, Assuming that the total station with reflector is the tool that it is intended to lay out the circular curve after being designed then the only way to do so is to construct a table that contains angle-distance values. we appreciate everything you did for us to resolve the issue. (Construction will not affect the park itself.) Move the device until the horizontal circle reads zero. The elevated Ontario Line station will have a centre platform and two entrances. From the plan (fig 1), the centre line of the walls are calculated. Each maker may have varied models, together with optional features which may be tailored to local working conditions, such as accuracy requirements, project size (EDM distances), and also accessible crew size. This resulted in accomplishing the stake-out of all 20,000 points in 4 days." Step 4: Attach the Tribrach and Coarse Level the Tripod Over the Benchmark. [71], The portal to the tunnelled portion of the line will be just east of the station platforms. Station names and other details are subject to change. The Ontario Line would share less than half the planned route of the Relief Line between Osgoode and Pape stations. [5], A ground-breaking ceremony attended by Ford, Tory, and other politicians and officials was held on March 27, 2022 at Exhibition Place, despite no major contracts having been awarded at that point. This assistance is exactly why we have had such a great relationship in the past, and why we continue to work with NSS. One entrance will be on the north side of Queen Street under the bridge. Learn more. A total station is an electronic/optical instrument used in modern surveying. [5], In 2019, the estimated cost of the line was to be about $10.9 billion. Extract and relate coordinate information from drawings. Its northern terminus will be at Eglinton Avenue and Don Mills Road, at Science Centre station, where it will connect with Line 5 Eglinton. Place the total station in the spot from which you want to stake out points after you have finished entering the coordinates for the area into the total station's internal memory. The TinySurveyor: a Robotic Land Surveyor. Resection and COGO. Share it with your friends! In downtown Toronto, station stands on Front Street West on the south side of the block bordered by Bay Street and York Street. A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. Titled the "Ontario Line Loop Connection", this conceptual corridor would be anchored around Pearson International Airport, downtown Toronto and Richmond Hill Centre, with an alignment from Pearson International Airport southeast to Kipling Station, then east to Exhibition GO Station (the western terminus of the original Ontario Line plans as announced by the Ontario government in April 2019), then operating on the planned Ontario Line alignment to the Ontario Science Centre (the eastern terminus of the original Ontario Line plans), then north to Richmond Hill Centre and west to Pearson International Airport along an undetermined route, to be implemented by 2051. The most frequently used surveying instrument today is the total station (As per below figure No1). The accuracies of measurements with the less expensive instruments probably run about 6(5 mm 1 5 ppm), and the expensive total stations can run about 6(1 mm 1 1 ppm). Set within a 20-minute walking distance from Rogers Centre, the hostel gives quick access to a bus stop in Downtown Toronto district. Page 9-2 Highway Surveying Manual January 2005 Total Station System (TSS) Survey Specification Highway Surveying Manual Page 9-3 [36], In July 2019, the estimated completion date was 2027. [18] Unlike the city's design, the Ontario Line would be a "standalone" line, one that would use lighter rolling stock and shorter trainsets than the Toronto Transit Commission's existing subway lines. After the position of the total station was identified, the 12 points of the specified building positions assigned were added in the data collector and then staked out. [19] Members of Toronto City Council expressed their concerns that the new line would set back the delivery of rapid transit and potentially waste money the city had already spent on the Relief Line's design. It will be constructed at the site of a parking lot. Its also mandatory that at least two people be on the crew. Manual errors involved in reading and recording are eliminated. Results showed that positioning accuracy of 1-3 cm was generally achieved. A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. Drive the tripod legs into the ground using the brackets on the sides of each leg. [21], The announcement that the line would extend to a new station at Ontario Place stirred controversy, as Premier Doug Ford had spoken of transforming Ontario Place, previously a family-oriented venue, into an adult-oriented casino complex. How to set out coordinate points using Leica TC407 VidioHD Read carefully through the User Manual before you switch on the product. LN-100 is effectively used for installing bases of solar panels Company YOUSUN, in Tsu, Mie, Japan, is an equipment installation construction company that specializes in general civil engineering works, as well as installation projects of water and sewer and social infrastructure equipment. Copyright 2016 Skyfi Education Labs Pvt. https://youtube.com/watch?v=iGRQqQ5UDXg for instantaneous determination of a total station location working on the site, by mounting the antenna directly on top of the total station alidade; thus eliminating the need for establishing permanent horizontal control stations. In the 1980s, plans first emerged for a "Downtown Relief Line" that would provide capacity relief to the Yonge segment of Line 1 and the BloorYonge interchange station, and extend subway service coverage in the city's east end. Obtain the architect or building plan. Results showed that positioning accuracy of 1-3 cm was generally achieved. Chris earned Bachelor of Arts degrees in journalism and English from Truman State University. The Total station is designed for measuring of slant distances, horizontal and vertical angles and elevations in topographic and geodetic works, tachometric surveys, as well as for solution of application geodetic tasks. Trimble Trimble S Series Total Station User Guide v Important Information 1 Laser Safety Before using the instrument, make sure that you understand this user guide, as well as all Metrolinx expects the Ontario Line connection at Pape station will reduce rush-hour congestion at BloorYonge station by 22 percent. Once the area has been mapped out, you can use the total station to perform a task called a stake out. It will also stake out the centerline itself. Running under Queen Street, it will cross under Line 1 at the station; the Lower Queen ghost station (a remnant of the never-completed Queen subway line) will be used for transferring between the two lines. As of June2021[update], Metrolinx had not indicated the location of entrances and exits for this station. Because of their capacity to improve the surveying operation significantly, they can be classified into a separate group. All control points used for data gathering and stake out, including photo control, are adjusted by the method of least squares. 4Site Office allows downloading, formatting and processing of survey data, whilst 4Site Survey links directly to your instrument for infield recording of data. A field laptop computer will run $2,000 to $3,000. The hands-on experience is invaluable in understanding the more abstract concepts associated with mathematics and instrument operation. Metrolinx plans to start the procurement process in 2020 to allow bidding companies to comment on the feasibility of the 2027 completion date. Topographic Surveying Using the Sokkisha SET2 Electronic The two city blocks bounded by Berkeley, King and Parliament Streets, and north of Parliament Square Park will be razed for tunnel launch shafts. Construction total stations support the various phases of stake-out tasks in the construction of gas utility infrastructure. Find out What is a Total Station? They are listed as follows: Manual Method - Manual slope staking using a rag tape, fiberglass rod and level. application of binomial distribution in civil engineering [30], The Ontario Line project is being delivered through various publicprivate partnerships (P3), progressive designbuild and traditional procurement contracts, which are all being staged accordingly for their successful delivery. Some total stations, such as the Leica FlexLine series, have a Reference Line application. Conventional Method Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. The new route would substitute a Corktown station about 500 metres (1,600ft) west of the proposed location for Sumach station on the Relief Line. Exhibitor demonstrations in state survey society meetings is another good place to observe and test new equipment. Flood mitigation projects and reconstruction of the Gardiner Expressway at Lower Don River may impede Ontario Line construction. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. Schabas supported using lighter metro vehicles such as those used in London's Docklands Light Railway, as such vehicles were deemed more suitable for steeper grades and elevated structures. A Total Station has electronic documentation and sketching functions, which reduces the need for paper field notes. Then the centre lines of the rooms are set out by setting perpendiculars in the ratio 3:4:5. Introduction. Switch on the Total Station (as below). This will allow you to see your current position's station and offset on an alignment, relative to a referenced road. Automated construction layout tool to speed-up jobsite stake-out using digital methods and BIM. To fully understand the use of surveying instruments, take a course from a licensed surveyor. At Pape station, the Ontario Line would connect with Line 2 BloorDanforth. [17] In early 2019, the Ontario government announced its intention to take over subway construction in Toronto from the TTC. [74] The MTO is planning a conceptual cross-regional rapid transit corridor that includes a "transit loop that connects the Ontario Line to new major transit hubs where regional services connect, including Pearson International Airport in Mississauga and Richmond Hill Centre, and to other subway and GO Rail lines". Operating the Ontario Line along an elevated Lakeshore East embankment might require slower speeds in order to navigate grades and curves. Again, because of the servo-driven design, the limit stops of the fine motion screws no longer can exist. Record angle and distance observations in the field. A total station is a device that you can use to plot out an area of land before you begin construction. leave the THUMBS UP!!! Quick setting of this instrument on the tripod with laser plummet, On-board area computation program to calculate the area of the field, Greater accuracy in area computation due to the possibility of taking arcs in area computation, Graphical view of land and plots and for quick visualization, Coding to perform automatic mapping. See More. Great 35 reviews. [46], Originally named Leslieville, RiversideLeslieville will be located on the railway bridge over Queen Street East on the boundary between the Riverside (west side) and Leslieville (east side) neighbourhoods. South of Gerrard station, the Ontario Line would run along the northwest side of GO Transit's Lakeshore East rail corridor located on an embankment. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. Operating distance range - of remote control (diameter): 5 - 328 ft. IP protection class: IP 55 (EN 60529) D. Total Station Instruments 2.5.12 2-06 Tapes A. A total station is a device that you can use to plot out an area of land before you begin construction. whenever the field jobs are finished, the map of this area with dimensions is ready after information transfer, Tremendous plotting and area computation in any user necessary scale, Integration of database (exporting the map to GIS packages), Full GIS creation (using Mapinfo software). Setting Out How To Use A Total Station Stakeout Program Step By Step Guide On Marking A Point. Product identification The type and serial number of your product are indicated on Use the locking knobs on the side of the theodolite to keep it aimed on the point. [10], The line will have 15 stations, with four connecting to other Toronto subway and light rail lines and two stations connecting to GO Transit rail services. Tip. Stake Points Screen . Like this post? Immediately south of this station, the line would turn west along the Hydro One right-of-way, and cross the Don Valley on a new bridge. Category: Total Station Vertical and Horizontal field check NEI The program Ranges with standard prisms and reflectorless version differ widely between manufacturers. Conventional Method Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. eames replica lounge chair review. Step 4. Running slightly east of Pape Avenue, the Ontario Line will have a centre platform under Line 2 at the station. At East Harbour, there would be three platforms each serving a pair of tracks: one platform for Ontario Line trains, one for westbound GO trains and another for eastbound GO trains. [65], The line will serve the existing Osgoode station, providing a connection to Line 1 YongeUniversity. Also, read: What is Chain Surveying (Principal, Procedure, Method, Instrument). Metrolinx prepared the plan for the Ontario Line in just three months based on a proposal by transit consultant Michael Schabas. The servo-driven instrument has the disadvantage of data collection and coding occurring at the instrument. Manual Total Stations It was necessary to read the horizontal and vertical angles manually in this type of instrument. Then select the Model of your Total Station from the dropdown menu. Total Station System (TSS) Survey Specification Highway Surveying Manual Page 9-3 January 2005 Total Station System (TSS) Survey Specification 9-04 Second Order . They are listed as follows: Manual Method - Manual slope staking using a rag tape, fiberglass rod and level. Use of Sokkia SET 4BII Electronic Total Stations When classical terrestrial surveying methods are used in staking out of highway construction projects one can meet with some difficulties such . Operating distance range - of remote control (diameter): 5 - 328 ft. IP protection class: IP 55 (EN 60529) 2. Setting Out How To Use A Total Station Stakeout Program Step By Step Guide On Marking A Point. Metrolinx would help relocate businesses within Thorncliffe Park. In August 2018, an alignment was approved by the Ontario Ministry of Environment, Conservation, and Parks. . Manufacturer Nikon-Trimble Co., Ltd. Technoport Mituiseimei Bldg. 0. . The line had one station on King Street and Sumach Street, then made an eastwest crossing of the Lower Don River to a station at Broadview and Eastern Avenue. Get Traffic & Exposure. [60][61], In February 2023, Metrolinx cut down 61 trees to prepare the station site for construction. By December 2020, the completion date had been revised to 2030. Diploma in Surveying using Total Station. A second entrance will be on the south side of Gerrard Street adjacent to Gerrard Carlaw Parkette. By November 2022, that estimate had nearly doubled to $17 to $19 billion. Refer to 6 Safety Directions for further informa- tion. The section between Queen/Sherbourne and Gerrard stations would come to the surface and mostly follow a railway right-of-way instead of being tunnelled. [71][72], KingBathurst station will be located at the intersection of King Street West and Bathurst Street. Finally, the data processed and stored in the Total Station can be downloaded to other computer systems, for archiving or distribution, or to be used https://youtube.com/watch?v=C78SuqmLPDE [11], Efforts to increase capacity on Line 1 included longer, walk through trains, as well as the transition to automatic train control to increase the frequency of service. SME MINEXCHANGE 2023 February 26th March 1st, NSS CANADA1351 E Unit #10, Kelly Lake Rd.Greater Sudbury, ON P3E 5P5, CAD/US Toll Free:+1 800 461 3223Telephone:+1 705 744 3246, 2023 NSS Canada | Leica Geosystems AG Part ofHexagon. Fig.1: Example plan to be set out on the ground. Press F4 OK. 8. Utilizing the telescope tangent screw and the tangent screw, center the eyepiece lens vertically and horizontally on the prism with the cross hairs centered on the prism. Press Enter. According to Metrolinx, the new line will do more than provide relief to overcrowding on Toronto's existing subway system: it will provide new connections to the communities of Flemingdon Park and Thorncliffe Park. A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. In order to begin excavation of trenches required for a building's foundation, the builder must know the positions and levels of building lines shown on the construction plans on the ground. Parts of the SET Total StationParts of the SET Total Station 3. More accurate versions are offered for construction design applicatione.g., 1-minute instruments. e.g. pane displays. Copyright 2023 Leaf Group Ltd. / Leaf Group Media, All Rights Reserved. . This discussion provides general guidance on the use of total stations on topographic surveys. Tip. Heavy fiberglass or wooden tripods are ideal for supporting total stations. A total station is an electronic/optical instrument used in modern surveying and building construction that uses electronic transit theodolite in conjunction with electronic distance meter (EDM).It is also integrated with microprocessor, electronic data collector and storage system. The This movement from the construction plan to the actual site by transferring dimensions from the layout plan to the ground is called setting out. The southern city block is the site of the First Parliament, and Metrolinx will allow archeologists to examine the site for artifacts before it is destroyed by construction. When you are satisfied with the results stake it and have the rodman write the cut or fill on the stake. Please read this operators manual carefully, before using this product. Under Manufacturer , select Sokkia or whichever is the correct manufacturer for your Total Station. [50], In 2019, Metrolinx was considering a means to link Exhibition station to Ontario Place to the south. SITENG - Setting Out #7 "Stakeout" In today's video I am showing how to use the Stakeout program using a Total Station. However, regardless of how technologically advanced the Total Station is built, it takes a competent surveyor to ensure an accurate and precise instrument station set-up. With the aid of trigonometry, the distances and angles may be utilized to calculate the real positions (x, y, and z or northing,) of surveyed points in total terms. In the mid-2010s, the City of Toronto developed plans for this line, known as the "Relief Line South",[a] between Pape station on Line 2 BloorDanforth and Osgoode station on Line 1 YongeUniversity. The next number is the beginningstationnumber. Focus and plate management tangent and locking screws vary widely between total station brands. INTRODUCTION This report discusses the use of the Sokkisha SET2 electronic total station for topographic surveying. Read carefully through the User Manual before you switch on the product. On the south side of the valley crossing, the line would enter a tunnel under Minton Place. All plummets, optical or electronic, should occasionally be checked, adjusted, and calibrated. Spread out the tripod legs evenly, about two to three feet for each leg, and center it over your benchmark stake. Using Real Time Kinematic (RTK) for construction staking is effective, and allows for real-time information and positioning so that the surveys and stake placement can be as accurate as conventional land surveying and done in less time. From US$ 22 /night Select. Once it has been properly calibrated, you can use the total station to stake out points. The city preferred that space be taken from the northbound lanes on University Avenue, but Metrolinx said building a shaft there would conflict with Line 1 running below. Metrolinx hired Schabas in December 2018 to lead a team to transform the Relief Line plans into the Ontario Line. [45], South from Pape station, the line would travel roughly under Pape Avenue, emerging to the surface just north of Gerrard Street.